- Joined
- Sep 4, 2020
- Messages
- 10,598
After the girls departed and the dust settled I have some time to finish the fabrication of the duct work and it time to return to the basement to double check what I have done. Here are some images.
The last detail I added was an access panel to allow me to reach inside the duct durring installation time to back up the the sheet metal when I drill holes to tie everything together. The two section are telescoping one inside the other so I can make up for any errors in my measurements between the two sides of the basement and aligning with trunk that will go up to the second floor.
I am going to attempt my first go at cloning a grape vine using an air layering device I acquired this afternoon just to get an idea what is involved with that.
Then it will be a movie night for us.
Ben
The last detail I added was an access panel to allow me to reach inside the duct durring installation time to back up the the sheet metal when I drill holes to tie everything together. The two section are telescoping one inside the other so I can make up for any errors in my measurements between the two sides of the basement and aligning with trunk that will go up to the second floor.
I am going to attempt my first go at cloning a grape vine using an air layering device I acquired this afternoon just to get an idea what is involved with that.
Then it will be a movie night for us.
Ben