Been awhile since i did any updates, life gets in the way sometimes.
Running electric, using 12 volt led lights, and a couple 120 runs for some things. until I get the solar fridge. Will get some interior pics as i move forward. Only have the kitchen side installed, 3 runs of 3...really is bright.
Here are some pics of the clearing around the house. #5 and #6 is 8 ft off level back to front, and will be filled with what's dug out for the pond, which is going in the right center of #1, which should get started next week when the septic is installed.
Running electric, using 12 volt led lights, and a couple 120 runs for some things. until I get the solar fridge. Will get some interior pics as i move forward. Only have the kitchen side installed, 3 runs of 3...really is bright.
Here are some pics of the clearing around the house. #5 and #6 is 8 ft off level back to front, and will be filled with what's dug out for the pond, which is going in the right center of #1, which should get started next week when the septic is installed.